mdmFacet
Mar April 2024 May
MoTuWeThFrSaSu
  1  2  3  4  5  6  7
  8  91011121314
15161718192021
22232425262728
2930 

Detail

EuropeanaInformation 
Raw data [ X ]
<section name="raw">
    <SEQUENTIAL>
      <record key="001" att1="001" value="LIB904862203" att2="LIB904862203">001   LIB904862203</record>
      <field key="037" subkey="x">englisch</field>
      <field key="050" subkey="x">Buch</field>
      <field key="076" subkey="">Ökonomie</field>
      <field key="087" subkey="a">13</field>
      <field key="100" subkey="b">falster, peter (ed.)</field>
      <field key="103" subkey="">electric power engineering department, technical university of denmark, lyngby, denmark</field>
      <field key="104" subkey="b">rolstadas, asbjorn (ed.)</field>
      <field key="107" subkey="">production engineering laboratory, nth-sintef, trondheim, norway</field>
      <field key="200" subkey="b">international federation for information processing (ifip) (ed.)</field>
      <field key="331" subkey="">production management systems</field>
      <field key="335" subkey="">proceedings</field>
      <field key="403" subkey="">1. ed.</field>
      <field key="410" subkey="">amsterdam, new york, oxford</field>
      <field key="412" subkey="">north-holland publishing company</field>
      <field key="425" subkey="">1981</field>
      <field key="433" subkey="">viii, 221 pp.</field>
      <field key="507" subkey="">ifip international workshop on automation of production planning and control ; international federation for information</field>
      <field key="pro" subkey="c">essing (ifip) (sp.) ; trondheim, norway ; 1980, september 3-5</field>
      <field key="517" subkey="c">from the table of contents: preface; opening session; trends in production management; design methods for production systems;</field>
      <field key="app" subkey="l">ications of production planning systems; cost aspects of production planning;</field>
      <field key="540" subkey="">0-444-86176-9</field>
      <field key="544" subkey="">9719-A</field>
      <field key="700" subkey="b">658</field>
      <field key="700" subkey="b">general management</field>
      <field key="710" subkey="">production planning -- automation -- congresses</field>
      <field key="710" subkey="">production control -- automation -- congresses</field>
    </SEQUENTIAL>
  </section>
Servertime: 0.187 sec | Clienttime: sec