Detail
Raw data [ X ]
<section name="raw"> <SEQUENTIAL> <record key="001" att1="001" value="LIB905365501" att2="LIB905365501">001 LIB905365501</record> <field key="037" subkey="x">englisch</field> <field key="050" subkey="x">Buch</field> <field key="076" subkey="">Sozialwissenschaft</field> <field key="200" subkey="b">international labour office (ilo) (ed.)</field> <field key="331" subkey="">introduction to work study</field> <field key="403" subkey="">3., (revised) ed.</field> <field key="410" subkey="">geneva</field> <field key="412" subkey="">international labour office</field> <field key="425" subkey="">1981</field> <field key="433" subkey="">xiv, 442 pp.</field> <field key="451" subkey="">ilo (international labour office) publications</field> <field key="451" subkey="i">international labour office (ilo) (ed.)</field> <field key="517" subkey="c">from the table of contents: preface; productivity and work study: productivity and the standard of living; productivity in the</field> <field key="ind" subkey="i">vidual enterprise; reducing work content and ineffective time; work study; the human factor in the application of workstudy;</field> <field key="wor" subkey="k">ing conditions and the working environment; method study: introduction to method study and the selection of jobs; record,</field> <field key="exa" subkey="m">ine, develop; the flow and handling of materials; movement of workers in the working area; methods and movementsat the</field> <field key="wor" subkey="k">place; define, install, maintain; work measurement: general remarks on work measurement; work sampling; time study. the</field> <field key="equ" subkey="i">pment; time study. selecting and timing the job; time study. rating; time study. from study to standard time; setting time</field> <field key="sta" subkey="n">dards for work with machines; example of a time study; predetermined time standards; standard data; the use of time</field> <field key="sta" subkey="n">dards; from analysis to synthesis. new forms of work organisation: combined methods and tasks. new forms of work</field> <field key="org" subkey="a">nisation; appendices;</field> <field key="540" subkey="">92-2-101939-X</field> <field key="544" subkey="">10418-B</field> <field key="700" subkey="b">658</field> <field key="700" subkey="b">general management</field> <field key="710" subkey="">work measurement</field> <field key="710" subkey="">methods engineering</field> <field key="720" subkey="">management</field> <field key="720" subkey="">personnel management</field> <field key="720" subkey="">labor supply</field> <field key="720" subkey="">work study</field> </SEQUENTIAL> </section> Servertime: 0.308 sec | Clienttime:
sec
|