Detail
Raw data [ X ]
<section name="raw"> <SEQUENTIAL> <record key="001" att1="001" value="LIB905485300" att2="LIB905485300">001 LIB905485300</record> <field key="037" subkey="x">englisch</field> <field key="050" subkey="x">Buch</field> <field key="076" subkey="">Ökonomie</field> <field key="100" subkey="">baker, kenneth r.</field> <field key="103" subkey="">dartmouth college</field> <field key="331" subkey="">introduction to sequencing and scheduling</field> <field key="403" subkey="">1. ed.</field> <field key="410" subkey="">new york, chichester, brisbane</field> <field key="412" subkey="">john wiley and sons</field> <field key="425" subkey="">1974</field> <field key="433" subkey="">ix, 305 pp.</field> <field key="451" subkey="">engineering</field> <field key="451" subkey="i">board of advisors (ed.)</field> <field key="517" subkey="c">from the table of contents: preface; introduction; single-machine sequencing with independent jobs; general purpose methodologies</field> <field key="for" subkey="">the single-machine problem; extensions of the basic model; parallel-machine models; flow shop scheduling; job shop</field> <field key="sch" subkey="e">duling; simulation studies of the dynamic job shop; network methods for project scheduling; resource-constrained project</field> <field key="sch" subkey="e">duling; appendices;</field> <field key="540" subkey="">0-471-04555-1</field> <field key="544" subkey="">10491-A</field> <field key="700" subkey="b">658</field> <field key="700" subkey="b">general management</field> <field key="710" subkey="">production scheduling</field> </SEQUENTIAL> </section> Servertime: 1.361 sec | Clienttime:
sec
|